Search eceee proceedings
Can a 400 kV transmission line be avoided by a combination of efficient energy measures?
Panel: Panel 4: Environmental Perspective (externalities and life cycle approaches, local and global impacts and incentatives)
Authors:
Michel Labrousse, Explicit
Catherine Vallee, Geres
Eric Buchet, Geres
Nicolas Noudant, Inestene
Sergio Milano, Soges
Walter Römer, Fichtner
Abstract
Since more than ten years the French utility, Electricity de France (EDF) is willing to complete the 400 kV network which supplies power to the South-East part of France: the area is lined by the Alpes mountains by the North, the Mediterranean Sea to the South, Italy border to the East and the river Rhône to the West. The "Provence-Alpes-Côte-d'Azur" (PACA) region is supplied by a 400 kV transmission line running eastward from Tavel (near Avignon) down to Néoules (near Toulon) then North by North-East up to Le Broc-Carros (near Nice). The Northern branch of the loop runs from Tavel eastward to Boutre (near Manosque) then to Boutre-Carros through the tourist area of Gorges du Verdon (a National Park). The last section (Boutre-Broc-Carros) is a 225 kV line; when a failure occurs today on the 400 kV South branch the capacity of the 225 kV North branch may not be sufficient to continue supplying the whole area in any circumstances (application of N-1 criteria). A new 400 kV line seems to be essential to link Boutre to Le Broc-Carros. The problem is the intransigent attitude of opponents of the area: inhabitants, associations and elected representatives. As a contribution to facilitate the dialogue between EDF and the people living in the sensitive area, the Government established a "Débat Public" process. This kind of "hearings" allowed to a very large number of people to express their opinion and to be informed on technologies, energy planning and economics, safety and hazards from HV lines, etc.
Paper
Download this paper as pdf: Paper










