Search eceee proceedings

White certificates in Italy: will it overcome the huge challenges it has been facing in the last three years?

Panel: 3. Policy and governance

This is a peer-reviewed paper.

Authors:
Dario Di Santo, FIRE, Italy
Livio De Chicchis, FIRE, Italy

Abstract

The Italian White certificates scheme (WhC) was introduced in 2001 and has been effectively working since 2005. It has been characterised by rising targets, all sectors and energy efficiency solutions covered (at least in the first decade), and many flexibility options in place (e.g. non-obliged – a.k.a eligible – parties, tradable market for white certificates, bankability, flexibility on obliged parties targets, etc.). With more than 26 million tons of oil equivalent (toe) of energy savings cumulated by the end of 2017 it has contributed to the national energy efficiency targets.

The scheme underwent important changes first in 2012, then in 2017, both for the targets and the operating guidelines. These modifications, combined with energy market developments, resulted in a reduced capability of producing the expected certificates and in an increasingly shorter WhC market, thus putting at risk both the compliance with the targets and the operation of the scheme itself.

The paper will illustrate the main issues that affected the scheme over the years, in particular in the recent years, the effects produced by 2017 guidelines, and the need to adopt new rules in 2018 to avoid a collapse driven by skyrocketing market prices and an insufficient number of certificates to reach even the minimum targets (i.e. considering the flexibility given to the obliged distributors to postpone part of them for 1-2 years). An historical excursus which can be useful to understand the challenges that an Energy Efficiency Obligation scheme (EEO) with tradable market can pose to policy makers and also the potential in terms of results.

The paper will cover the main modifications and the issues arisen over the years and illustrate the effects of the new rules introduced in 2018, providing figures on the results in terms of issued certificates and market price. Besides, the cost-effectiveness of the scheme will be evaluated, considering the different phases (with and without the tau coefficient, the multiplier introduced in 2011 and abandoned in 2017).

Downloads

Download this presentation as pdf: 3-059-19_DiSanto_Presentation.pdf

Download this paper as pdf: 3-059-19_DiSanto.pdf