Pre-commercial procurement for upgrading buildings to be self-sufficient on 100% renewable energy
Panel: 7. Policies and programmes for better buildings
This is a non-peer reviewed extended abstract. No paper available.
Authors:
Mehmet Börühan Bulut, empirica, Germany
Georg Vogt, empirica, Germany
Abstract
Pre-commercial Procurement (PCP) is an EU instrument to promote innovation by using public procurement to challenge the industry to develop and test innovative solutions while providing companies with a first customer reference. The EU Horizon-funded PCP project procuRE brings together the cities of Istanbul (TR), Barcelona (ES), Nuremberg (DE), Vila Nova de Gaia (PT), Velenje (SI) and Eilat (IL) to jointly procure R&D services to renovate three schools and three office buildings to become energy self-sufficient on 100% renewable energy. Given that the cities own and operate around 21,000 of public buildings, they are looking for a versatile Renovation Approach that is replicable to be applied to any of their buildings. The resulting Renovation Packages for specific buildings are expected to take into account the needs and the expectations of key stakeholders that interact with the building, including users and maintenance personnel, and be developed through a Co-Design process in dialogue with these stakeholders. Continuous Commissioning is also a key aspect of the project, where suppliers are expected to ensure good monitoring, diagnostics and verification, as well as preventive maintenance.
A Call for Tender with specific requirements, shaped by the market input through Open Market Consultations (OMC) and the demands of the procurers, was published to select six suppliers that will propose their renovation approach that is applicable to any school or office building in Europe. The PCP has three phases; in the first phase, six suppliers enter an innovation funnel and develop rough designs for each building based on their innovation approach; in the second phase after the first call-off, four suppliers further develop their solutions and provide detailed designs of the proposed solutions; in the third phase after the second call-off, two suppliers finalise their designs and each test them in three buildings, including at least a school and an office building.
Downloads
Download this presentation as pdf: 7-069-22_Bulut_pres.pdf
Panels of
1. Dynamics of consumption: less is more?
2. Efficiency and beyond: innovative energy demand policies
3. Policy, finance and governance
4. Monitoring and evaluation for a wise, just and inclusive transition
5. Towards sustainable and resilient communities
6. Energy-efficient and low-carbon mobility for all
7. Policies and programmes for better buildings
8. Innovations in products, systems and building technologies