Transaction costs for acquiring building-mounted solar PV systems – insights from Sweden

Panel: 7. Policies and programmes for better buildings

This is a non-peer reviewed extended abstract. No paper available.

Authors:
Sofie Sandin Lompar, IIIEE, Lund University, Sweden
Lena Neij, IIIEE, Lund University, Sweden

Abstract

Central to the European Green Deal is the decarbonisation of buildings to realize a zero-emission building stock by 2050. In this process of decarbonisation, the deployment of building-mounted solar photovoltaic (PV) systems will be essential. Still, electricity generated from solar PVs is marginal in the EU, and several studies have presented barriers to the deployment of PVs, including for example a lack of objective information, complex administrative processes, and finding trustworthy installation companies. Such barriers can also be understood and addressed in terms of transaction costs (TCs), i.e. costs that go beyond the market price of the PV system, arising from tasks related to the acquisition of solar PVs. Knowledge on the magnitude and distribution of TCs will advance our understanding of barriers to deployment of solar PVs, and will be valuable in the design of effective policy interventions.

In this study, which is financed by the Swedish Energy Agency, we quantify TCs carried by Swedish households acquiring PVs. TCs are expressed as hours spent on 14 tasks across the PV acquisition as illustrated below. Data was collected using online surveys with 264 respondents, encompassing residential single-family house-owners who acquired a building-mounted PV system between 2015-2020.

The results reveal that the magnitude and distribution of TCs across the PV acquisition vary substantially between respondents, with individual processes ranging from 2-677 hours.

The rounded average distribution of the TCs across the 14 tasks is as follows:

Preparing for the solar PV acquisition

1. Searching/assessing information related to PV system design, technical/construction limitations, placement, etc. (37%)

Selecting and maintaining contacts with suppliers and installers

2. Searching for information about PV suppliers/installers (14%)

3. Asking for/evaluating quotes (5%)

4. Negotiating/contracting with firm(s) (4%)

5. Contacts with PV installers during mounting/installation of PV (7%)

Applying for required permits

6. Searching for information about building permit regulations (2%)

7. If required, preparing a building permit application (9%)

8. Contacts with the grid operator for a connection permit (3%)

Planning and securing finance and insurance

9. If a loan is required, search and compare banks (1%)

10. Searching for information about financial support schemes (6%)

11. Applying for financial support schemes (7%)

12. Searching and comparing insurances (1%)

13. Searching for information about the sale of excess electricity (4%)

14. Contracting with utility about the sale of excess electricity (3%)

The largest share of TCs lies in the preparation of the acquisition, where adopters are tasked with finding and processing information on constructional, technical, and regulatory aspects, followed by identifying PV suppliers and installers. Other tasks that are experienced as burdensome include complicated bureaucracy related to subsidies and building permits, and problematic installations. Conversely, aspects surrounding insurances are generally of minor concern along with acquiring bank loans. However, it is important to stress that average values sometimes hide important results, as in the case of the task "asking for and evaluating quotes". This task shows a rather high average time spent, while also having one of the highest numbers of unique respondents spending no time at all. This points to important differences in the individual PV acquisition experiences, where 38% of the adopters accept a bid without further assessment or comparisons.

The policy environment surrounding PVs in Sweden has undergone several changes over the investigated period, yet with only marginal improvements in overall TCs discernible. The wide range of reported time spent on the entire acquisition, however, suggests that there are opportunities to further streamline the acquisition process and thereby reducing TCs carried by PV adopters.